Behind-the-meter power — gas turbines, reciprocating engines, fuel cells and co-located nuclear or renewable-plus-storage systems — has moved from a resiliency afterthought to the default route for gigawatt-scale AI campuses, as the US interconnection queue swells to roughly 2,600GW, with nearly 80% of queued projects ultimately withdrawn.
The pain point is no longer equipment reliability — it is grid access. The US interconnection queue has grown from 1,400.00 GW in 2021 to approximately 2,600.00 GW in 2026, an increase of 85.71%, and median time to commercial operation has stretched to nearly five years, with Google publicly citing data center-specific delays of up to 12.00 years. Close to 80.00% of queued projects are ultimately withdrawn, and a withdrawn project absorbs 30.00%–37.00% of total project cost versus 6.00%–8.00% for one that is completed.
PJM's shift to a 'first-ready, first-served' cluster-study process targets one- to two-year timelines for new agreements, but has not yet cleared the existing backlog — leaving behind-the-meter generation as the only reliable way to hit an energization date measured in quarters rather than years.
Free access is capped at two reports per business domain. Personal email IDs are not accepted.